-
23.00.1
In General
23.00.1
In General
A "zero lot line" situation occurs when the perimeter or the proposed perimeter boundaries of a building or structure are located on part of the boundary lines of the property.
"Zero lot line" structures are typical of "Planned Unit Developments" (PUD's).
In regard to a "zero lot line" situation, extreme care should be exercised in connection with:
- the right of legal access to and from the property.
- the possible existence of encroachments of the sides of the buildings or structures upon the common areas.